Delta V Instruments · Bid Phase 1

BAE Multizone BI Chamber

Technical and program discovery for replacing BAE's 8 Accel-RF stands and 2 in-house LN2 stands. Options under review: Despatch RBC stackable, an in-between size, current-style Delta V chambers, or a standard stand.

Accel-RF stands
8 × 16 DUT
LN2 stands
2 × 4 DUT
Request date
Oct 16, 2026
Constraint
Low ESS ceiling
0/37 · 0%

Partial answers are fine — capture what's known and fill gaps on a call or site visit. Send controlled data only through approved export-control channels.

01

Current Accel-RF BI Stands

8 total: 7 HPA, 1 driver amp · 16 DUTs each

0/11
02

In-House LN2 BI Stands

2 total · 4 DUTs each

0/6
03

Requirements for the New Systems

Multizone BI — Delta V chamber, Despatch RBC, in-between, or standard stand

0/7
04

ESS Lab Facility

Lower ceilings — smaller form factor preferred

0/6
05

Data and IT

0/3
06

Program and Schedule

0/4

BAE Systems

Delta V Instruments